2016年至今的银行利率:帮我译成英文!!!!

来源:百度文库 编辑:高考问答 时间:2024/04/29 08:17:53
矿山恢复建设规模为31万t/a,其中一区和二区建设规模各为8万t/a,三区、四区和五区建设规模各为5万t/a。

The mine's construction scale has restored to 31万t/a,the first and the second region each has 8万 t/a,and the third ,the forth and the fifth region each has 5万 t/a

Restoration of the size of mine 310,000t/a, one of the district and the size of the building for two District 80,000t/a, three districts, four district and the size of the building for five District 50,000t/a.

The mineral mountain instauration constucts the scale as 310,000 ts/ as, an among those areas and two areas constuct scale are 80,000 ts/ as perspectively, three areas, four areas and five areaseses constuct scale are 50,000 ts/ as perspectively.